How to Prepare for a Major Home Remodel: Budget, Permits & Checklist
What to decide, check and set up before a kitchen, bathroom or whole home remodel, from budget to the week before demolition.

Scope
Determine your scope of work
Timing
Decide when you want the work done
Investment
Know how much you can invest
Updated November 8, 2026 · 4 min read · Reviewed by Dan Dragomir, founder of dRemodeling
1. Define your goals and your budget
- List what isn’t working. Storage, layout, light, a leaking shower, not enough seating. Photos of what you like help more than a finished design.
- Separate must-haves from nice-to-haves. It makes trade-offs easier later.
- Set a realistic range. Our planning ranges: $30K–$45K+ for a hall bath, $55K–$100K+ for a primary bath, $70K–$110K+ for a same-layout kitchen and $110K–$180K+ for a new layout.
- Add a contingency. Older homes and projects with structural, plumbing or electrical changes need a larger reserve for what’s behind the walls.
- Think about timing. A typical bathroom takes about 3–5 months from the first call to the finished room and a kitchen about 5–6 months, so start early and plan around holidays and family events.
2. Choose the right contractor
Pennsylvania’s Home Improvement Consumer Protection Act gives you specific protections. Before you sign:
- Confirm the contractor’s Pennsylvania registration number (required for contractors doing $5,000 or more a year in home improvements) at attorneygeneral.gov or 1-888-520-6680. Our home improvement contractor registrations are PA031113 in Pennsylvania and 13VH06765000 in New Jersey (registrations, not trade licenses), and we hold Philadelphia license #36364.
- Get a written contract for anything over $500, with start and completion dates, a description of the work and materials, the total price, and the contractor’s insurance.
- Know that you can cancel a home improvement contract within three business days of signing.
- Ask how changes are handled. Ours are submitted in writing and approved before the work is done.
- Ask for the warranty in writing.
3. Make your selections before construction
The single best way to protect your schedule is to make decisions early. In our showroom you choose cabinetry, counters, tile, fixtures, lighting and hardware with your designer, and see how each choice affects the budget. Order lead times vary, and a missing faucet can stop a crew for days.
Our contracts ask homeowners to finish all selections at least two weeks before the start date, and we order and track materials so the crew starts once they are ready.

4. Understand permits and older-home issues
Most kitchen and bathroom remodels involve permitted plumbing and electrical work. In Philadelphia, qualifying kitchen and bathroom alterations in one-family homes can use the city’s EZ permit, filed by a licensed plumbing contractor, with electrical work permitted separately. Creating a new bathroom or kitchen, structural work and two-family or multi-family buildings need more. Suburban townships have their own rules, and your contractor should identify them during planning.
Many Philadelphia-area homes are old. For homes built before 1978, federal EPA rules require renovators who disturb painted surfaces to be lead-safe certified and follow lead-safe work practices. Expect older wiring, plaster, out-of-level floors and past repairs, and keep your contingency for them.
5. Get your home ready (the week before)
- Empty the room completely, plus nearby cabinets, closets and shelves.
- Take pictures, mirrors and valuables off walls on both sides of walls being worked on; vibration travels.
- Set aside a space near the work area for materials and tools to be staged.
- Plan parking and access for the crew, deliveries and a trailer or dump truck.
- Keep pets and children out of work areas, and plan where they’ll be during loud days.
- Set up a temporary kitchen (refrigerator, microwave, coffee maker, a table) or a bathroom plan if it’s your only one.
- Tell your neighbors, and check condo or HOA rules about work hours and elevators.
- Call your insurance agent if the project is large, especially for additions or major structural work.
6. During the remodel
- Keep one point of contact. With us, that’s your project manager, plus weekly updates on progress, milestones and decisions needed.
- Put every change in writing before the work is done; changes requested casually on site are how surprises happen.
- Expect some dust and noise even with floor protection, zipper walls and daily cleanup.
- Visit the site at agreed times and ask questions early.
7. After the remodel
At the end we finish the punch list and walk through the space with you. You get your final project documents, care information for your new materials and the details of your warranty. Unfinished punch-list items are completed as part of the project; defects in our workmanship that appear after completion are handled under the warranty. See how our warranty and aftercare work.
Next step: Our process at dRemodeling · Full pricing guide · See our projects
Sources
- dRemodeling, Remodeling Costs & Pricing (planning ranges)
- Pennsylvania Attorney General, Home Improvement Consumer Protection Act brochure
- 73 P.S. § 517.7, Home improvement contracts (HICPA)
- City of Philadelphia L&I, EZ Bathroom and Kitchen Alterations Permit Standard
- U.S. EPA, Lead Renovation, Repair and Painting (RRP) Program
Ranges and timelines are typical planning figures, not quotes. Your proposal reflects your home, scope and selections.
KEEP READING
Related guides.

PLANNING & TIMELINES
Planning a Whole-Home Renovation in Philadelphia
$150K+ for multi-room projects · scope, permits, living arrangements
Read the guide
DESIGN & MATERIALS
Design-Build vs. Traditional Remodeling Contractors
One team for design and construction vs. separate hires
Read the guide
PLANNING & TIMELINES
How Long Does a Kitchen Remodel Take?
About 5–6 months overall · 9–12+ weeks of construction
Read the guide
Ready to start planning your remodel?
Tell us about your project. We’ll reach out within one business day, or you can choose a convenient time for us to call you.
Scheduling a callback is optional.
Philadelphia, PA 19128
Showroom by appointment
Kitchen, bathroom and whole home remodeling in Philadelphia, the Main Line, Montgomery, Bucks, Delaware and Chester counties, and select areas of New Jersey.